By ,
10/07/2025
Escape of water (EoW) damage is one of the most frequent and costly causes of construction claims in the UK. One example in recent years came from a failed joint in a high-rise London development that led to a £25 million insurance settlement. Beyond the immediate property damage, such incidents disrupt project timelines, increase workloads and costs, and can significantly impact companies’ financial performance, reputation, and future insurance coverage and premiums.
Understanding the risks: Why EoW persists
EoW claims in construction often stem from a combination of factors, including poor workmanship, particularly in faulty pipe joints and fittings, plumbing system failures such as corrosion and joint failures, and external influences like frozen pipes during cold weather or blocked drains causing overflow. These issues can be exacerbated in complex multi-storey buildings, where the use of plastic pipes, inadequate testing, and under par project risk management can increase vulnerability.
Strengthening defences: Water risk management standards
In response to these challenges, the UK construction industry has seen the introduction of more stringent water management requirements. A landmark development came in 2024 with the Fire Protection Association’s (FPA) publication of the first Joint Code of Practice (JCoP) on the prevention and management of escape of water on construction sites. The guide was developed by RISCAuthority and the Construction Insurance Risk Engineers Group (CIREG) and is endorsed by the London Engineering Group (LEG) and the Chartered Institute of Plumbing and Heating Engineering (CIPHE).
The JCoP aims to reduce both the frequency and severity of EoW incidents during pre-construction and construction phases. This should result in fewer insurance claims and lower costs for developers and contractors.
Best practices for water systems management
The JCoP provides best practice guidelines for managing temporary and permanent water systems within buildings. It addresses plumbing, water storage, and mechanical systems across a range of construction and refurbishment projects.
Designed to support all parties in the construction supply chain — from designers and specifiers to contractors — the guidance seeks to mitigate water damage risks and prevent project delays.
Building on and expanding the CIREG’s 2019 fifth edition guidance, Managing escape of water risk on construction sites, the JCoP introduces a broader scope and mandatory obligations, reflecting the evolving complexity of modern construction.
Construction stakeholders are expected to be aware of the JCoP guidelines and maintain compliance to prevent EoW incidents, mitigate potential claims, and contribute to smooth and timely project schedules.
The JCoP strengthens previous guidance by emphasising:
As UK construction stakeholders adopt the JCoP, contractors and developers should:
One year on from the introduction of the JCoP, the UK construction sector is making important strides in managing EoW risks. By adopting these enhanced standards early in planning a construction project and embedding robust water management practices, stakeholders can protect their projects, reduce costly claims, and contribute to a safer, more resilient built environment.
For more insights on construction risk management and insurance, please contact your Marsh representative.